Protection coordination and relay verification
MV protection coordination and on-site check of the settings.
Study
When a fault occurs, only the nearest protection should trip, and fast enough for the equipment to withstand it.
We check protection coordination (selectivity) in the worst-case configuration, with maximum and minimum short-circuit currents and maximum load current. A single calculation case is not enough.
Four types of discrimination exist and are often combined. Current discrimination relies on thresholds, time discrimination on time delays, typically 250 to 300 ms between stages. With logic discrimination, the downstream protection blocks the upstream one. Differential protection monitors a closed zone and operates instantaneously.
Earth faults are treated separately. Their current depends on the neutral earthing arrangement and is sometimes too low for conventional functions. We check the current transformers at the same time, because a saturating CT distorts every calculated time.

Usual content of an offer for this type of assignment. The exact scope, deliverables and price are set in the quotation.
Maximum and minimum currents, three-phase and earth, per busbar.
Relays, CTs and settings, from feeder to incomer.
Margins at the critical points, CT verification.
Justified corrections and updated settings schedule.
Maximum and minimum, three-phase and earth, per busbar.
From feeder to incomer, each relay and its CT.
Margins measured at the critical points.
Proposed corrections, updated settings schedule.
Industrial site
MV protection coordination and on-site check of the settings.
General contractor
Selection of protection functions, current transformer sizing, settings, follow-up of testing through to commissioning.
Coordination checks that the settings work together. The protection plan goes further and also covers the choice of functions and current transformers, as well as the settings schedule.
Yes, on site with our injection test sets (see Protection, tap changer and automation testing).