Equipment sizing

We calculate short-circuit currents and size the equipment that must withstand them, namely switchgear, cables, transformers and the earthing system.

Short-circuit

The calculation follows IEC 60909 and gives the initial, peak, breaking and steady-state currents, at maximum for equipment withstand and at minimum for protection. The peak depends on the R/X ratio. At 12.5 kA rms, the DC component takes it above 30 kA, and the forces on the busbars are calculated from this value.

Cables

The cross-section is determined to NF C 13-200 and IEC 60287, with the Neher-McGrath method for complex installations (heavily loaded cable layers, ducts, crossings, deeply buried cables). We also check short-circuit thermal stress, voltage drop and screen earthing.

Earthing system

We design the earthing system to NF EN 50522 (2022 edition), which covers the earthing of installations above 1 kV alongside IEC 61936-1, and to IEEE 80 on international projects. The standard assesses the installation on touch and step voltages, compared with permissible values that depend on the fault clearing time. A resistance value is therefore not enough to conclude, and the earthing system is designed together with the protection plan.

The earth potential rise of the substation is also transferred off site through fences, cable screens, pipes and telecom lines. We identify these transfers and deal with them.

Insulation coordination

To IEC 60071, we check equipment insulation levels, the selection and location of surge arresters, and clearances. When switching or lightning overvoltages have to be calculated, we use an EMT study.

01What we do

Short-circuit

  • IEC 60909, maximum and minimum
  • Withstand of switchgear and busbars
  • Cable thermal stress (I²t)

Cables

  • Cross-section and installation method
  • Neher-McGrath thermal calculation
  • Voltage drop
  • Screen earthing

Transformers

  • Rating and short-circuit impedance
  • On-load tap changer range
  • Inrush current

Earthing system

  • NF EN 50522 and IEC 61936-1
  • Earth grid and rods
  • Step and touch voltages
  • Earth potential rise and transferred potentials

Insulation

  • IEC 60071 insulation coordination
  • Selection and location of surge arresters

02Examples

Asymmetrical short-circuit current and peak value to IEC 60909020406080100-40-200+20+40Time (ms)Current (kA)ip = κ·√2·I″k ≈ 32.1 kA (κ = 1.81)DC componentI″k = 12.5 kA · R/X = 0.07
Fig. 01Asymmetrical short-circuit. The DC component raises the peak to 32.1 kA for 12.5 kA rms (κ = 1.81). The forces on the busbars are calculated from this peak.IEC 60909 worked example
Ground potential around an earth electrode and transferred touch voltage020406080100120020040060080010001200Distance from substation centre (m)Voltage (V)substation earth grid1 m outside the grid: 34 V20 m outside the grid: 424 Vground potential (EPR ≈ 1060 V)contact with an object bonded to the substation earthρ = 100 Ω·m · IE = 2 kA · RE ≈ 0.53 Ω
Fig. 02Earth electrode of 0.53 Ω carrying 2 kA. The substation potential rises to about 1060 V, and a person touching an object connected to the substation earth 20 m outside the earth grid is exposed to more than 400 V. These voltages are compared with the permissible values of NF EN 50522.Worked example
Potential profile from an earthing system study
Fig. 03Potential profile of an earthing system.Anonymised deliverable

03Our offer

Usual content of an offer for this type of assignment. The exact scope, deliverables and price are set in the quotation.

  1. Package 1Short-circuit

    Maximum and minimum values to IEC 60909, per busbar.

  2. Package 2Equipment withstand

    Switchgear, busbars, CTs, cables.

  3. Package 3Cables

    Cross-section, installation method, thermal calculation, voltage drop.

  4. Package 4Earthing system

    Earth grid, touch and step voltages to NF EN 50522, transferred potentials.

04How we work

  1. 01Short-circuit

    Maximum and minimum values per busbar.

  2. 02Equipment withstand

    Switchgear, busbars, CTs, cables.

  3. 03Earthing

    Measured resistivity, earth grid, earth-fault current, current distribution.

  4. 04Verification

    Touch and step voltages, transferred potentials.

05References

Data centre campus

Earthing systems

Earth grid, step and touch voltages, earth potential rise, compatibility with telecom networks.

Storage developer

HV / MV substation for a battery storage plant

Transformers, switchgear, cables, protection and earthing. Preparation of tender documents and follow-up through to construction.

Data centre, Île-de-France

Load flow campaign on an ETAP model

Audit of the existing scenarios and sweep of upstream voltage × configurations. The on-load tap changer range of the 225 kV transformers proved insufficient.

All references

06Frequently asked questions

Do you carry out resistivity measurements?

Yes, with Volt Expertise, before the earthing study.

Is a low earth resistance enough?

No. NF EN 50522 assesses touch and step voltages, and a low earth resistance combined with a long fault duration can still be dangerous.

Which software?

ETAP for cables and earthing, ETAP or PowerFactory for short-circuit.

07See also

For a project, give us the voltage, power, location and deadline in a few lines.