Data centre campus
Earthing systems
Earth grid, step and touch voltages, earth potential rise, compatibility with telecom networks.
Study
We calculate short-circuit currents and size the equipment that must withstand them, namely switchgear, cables, transformers and the earthing system.
The calculation follows IEC 60909 and gives the initial, peak, breaking and steady-state currents, at maximum for equipment withstand and at minimum for protection. The peak depends on the R/X ratio. At 12.5 kA rms, the DC component takes it above 30 kA, and the forces on the busbars are calculated from this value.
The cross-section is determined to NF C 13-200 and IEC 60287, with the Neher-McGrath method for complex installations (heavily loaded cable layers, ducts, crossings, deeply buried cables). We also check short-circuit thermal stress, voltage drop and screen earthing.
We design the earthing system to NF EN 50522 (2022 edition), which covers the earthing of installations above 1 kV alongside IEC 61936-1, and to IEEE 80 on international projects. The standard assesses the installation on touch and step voltages, compared with permissible values that depend on the fault clearing time. A resistance value is therefore not enough to conclude, and the earthing system is designed together with the protection plan.
The earth potential rise of the substation is also transferred off site through fences, cable screens, pipes and telecom lines. We identify these transfers and deal with them.
To IEC 60071, we check equipment insulation levels, the selection and location of surge arresters, and clearances. When switching or lightning overvoltages have to be calculated, we use an EMT study.

Usual content of an offer for this type of assignment. The exact scope, deliverables and price are set in the quotation.
Maximum and minimum values to IEC 60909, per busbar.
Switchgear, busbars, CTs, cables.
Cross-section, installation method, thermal calculation, voltage drop.
Earth grid, touch and step voltages to NF EN 50522, transferred potentials.
Maximum and minimum values per busbar.
Switchgear, busbars, CTs, cables.
Measured resistivity, earth grid, earth-fault current, current distribution.
Touch and step voltages, transferred potentials.
Data centre campus
Earth grid, step and touch voltages, earth potential rise, compatibility with telecom networks.
Storage developer
Transformers, switchgear, cables, protection and earthing. Preparation of tender documents and follow-up through to construction.
Data centre, Île-de-France
Audit of the existing scenarios and sweep of upstream voltage × configurations. The on-load tap changer range of the 225 kV transformers proved insufficient.
Yes, with Volt Expertise, before the earthing study.
No. NF EN 50522 assesses touch and step voltages, and a low earth resistance combined with a long fault duration can still be dangerous.
ETAP for cables and earthing, ETAP or PowerFactory for short-circuit.
For a project, give us the voltage, power, location and deadline in a few lines.
Reply within 48 working hours.