Power producer, PV plant
Harmonic study on an industrial MV ring
Distortion levels across several scenarios, resonance risk and transformer derating.
Market
PV plants and wind farms. We carry out grid connection studies and compliance evidence, from the point-of-connection substation to the grid connection point.
The network operator checks reactive power at the point of delivery. Between the inverter terminals and that point, the internal network absorbs or generates reactive power depending on the transformers, the MV cables and their lengths. A plant can therefore be compliant according to the inverter datasheet without being compliant at the point of delivery.
Behaviour during faults (voltage dip ride-through, reactive current injection, active power recovery) is demonstrated by simulation, with verified inverter models.
Voltage quality is also examined, in particular inverter harmonics, resonances with cables and capacitors, and flicker.
Internal MV networks are long, often in rings or radial over several kilometres. Cable capacitance shifts the resonances and raises the voltage at low output. On the DC side, PV plants present an arc risk and require specific protection.
Depending on its power, the plant is connected to the distribution network (Enedis, at MV) or to the transmission network (RTE, at HV). At MV, the point-of-connection substation follows NF C 13-100, with an interface protection (protection de découplage) whose type and settings are imposed by the network operator. At HV, RTE's requirements apply at the connection point.
We carry out the calculations and prepare the evidence expected by the network operator. The submission remains the generator's responsibility. We also work for integrators in West Africa.

Usual content of an offer for this type of assignment. The exact scope, deliverables and price are set in the quotation.
Internal network, cables, transformers, inverter models.
Load flow, P/Q and U/Q diagrams at the point of delivery, short-circuit.
Fault ride-through, inverter EMT, harmonics, according to the applicable requirements.
Compliance notes in the format expected by the network operator, answers to its questions.
Check of the internal network data and of the manufacturer models.
Load flow, P/Q and U/Q diagrams at the point of delivery, short-circuit.
Voltage dips, inverter EMT, harmonics.
Notes and compliance conclusions in the format expected by the network operator.
Power producer, PV plant
Distortion levels across several scenarios, resonance risk and transformer derating.
Integrator, West Africa
Load flow, short-circuit, neutral earthing, earthing, stability and protection plan for each plant.
Integrator, West Africa
LV, MV and DC arc flash: incident energies and PPE per work location.
Wind farm owner
Technical notes on cable joint failures and switching overvoltages, responses to the opposing party's submissions (dires).
We produce the calculations and the evidence. Submission remains the responsibility of the generator.
No. We first check it on simple cases (setpoint step, voltage dip) before using it.
For a project, give us the voltage, power, location and deadline in a few lines.
Reply within 48 working hours.