We assist a party and its lawyer in court-appointed expert proceedings concerning an electrical asset, with analysis, technical notes and responses to submissions (dires).

An electrical dispute generally turns on precise physical mechanisms, such as switching overvoltages, partial discharge, a joint failure, coordination between work packages or settings. The court-appointed expert is often an electrical generalist, and the mechanism has to be presented to them clearly, quantified and verifiable.

We write short, referenced notes with reproducible calculations. They are written to be read by the expert, by the lawyer and by the opposing party, who will look for the flaw.

We also step in before any dispute. A failure analysis carried out early, while the evidence and the records still exist, often avoids proceedings or helps to prepare for them better.

01What we do

Analysis

  • Review of technical documents
  • Failure mechanisms
  • Standards and good engineering practice
  • Coordination between work packages

Proceedings

  • Numbered technical notes
  • Responses to the opposing party's submissions
  • Preparation for expert meetings

02Examples

Déroulé d'une expertise judiciaire et rôle du conseil technique d'une partieProceedingsLDHTIncidentFailureanalysisExpert appointedReview ofdocumentsExpert meetingsPreparation,attendanceSummary noteTech notes,repliesFinalsubmissionsFinalsubmissionFinal reportCritical review
Fig. 01Stages of court-appointed expert proceedings and role of the technical adviser at each stage.
Disturbance record of a phase-to-earth fault on a 20 kV feeder: phase currents, residual current, logicIAIB · IC3I051N pick-upTripCB openfaulttrip cmd 100 msbreak 160 ms-4004080120160200Time (ms)
Fig. 02Phase-to-earth fault on a 20 kV feeder. The 51N picks up, the trip command is issued at 100 ms and interruption occurs at 160 ms, i.e. a circuit-breaker break time of 60 ms.Calculated signals

03Our offer

Usual content of an offer for this type of assignment. The exact scope, deliverables and price are set in the quotation.

  1. Package 1Case file review

    Technical documents, contracts, records.

  2. Package 2Analysis

    Failure mechanism, standards and good engineering practice.

  3. Package 3Notes and submissions

    Numbered technical notes, responses to the opposing party's submissions (dires).

  4. Package 4Meetings

    Preparation for, and technical attendance at, expert meetings.

04How we work

  1. 01Case file review

    Technical documents, contracts, records.

  2. 02Analysis

    Failure mechanism, standards and good engineering practice.

  3. 03Notes and submissions

    Numbered technical notes, responses to the opposing party's submissions.

  4. 04Meetings

    Preparation for, and technical attendance at, expert meetings.

05References

Wind farm owner

Dispute over an MV cable network

Technical notes on cable joint failures and switching overvoltages, responses to the opposing party's submissions (dires).

Generating substation

Capacitor bank

Analysis of SCADA logs, identification of control hunting and projection of circuit-breaker wear.

All references

06Frequently asked questions

Are you a registered court expert?

No. We act as a party's technical adviser, as stated in the engagement letter.

Before any dispute?

Yes. A failure analysis carried out early often avoids proceedings or helps to prepare for them better.

07See also

For a project, give us the voltage, power, location and deadline in a few lines.
Reply within 48 working hours.

Write to LDHT