Wind farm owner
Dispute over an MV cable network
Technical notes on cable joint failures and switching overvoltages, responses to the opposing party's submissions (dires).
Service
We assist a party and its lawyer in court-appointed expert proceedings concerning an electrical asset, with analysis, technical notes and responses to submissions (dires).
An electrical dispute generally turns on precise physical mechanisms, such as switching overvoltages, partial discharge, a joint failure, coordination between work packages or settings. The court-appointed expert is often an electrical generalist, and the mechanism has to be presented to them clearly, quantified and verifiable.
We write short, referenced notes with reproducible calculations. They are written to be read by the expert, by the lawyer and by the opposing party, who will look for the flaw.
We also step in before any dispute. A failure analysis carried out early, while the evidence and the records still exist, often avoids proceedings or helps to prepare for them better.
Usual content of an offer for this type of assignment. The exact scope, deliverables and price are set in the quotation.
Technical documents, contracts, records.
Failure mechanism, standards and good engineering practice.
Numbered technical notes, responses to the opposing party's submissions (dires).
Preparation for, and technical attendance at, expert meetings.
Technical documents, contracts, records.
Failure mechanism, standards and good engineering practice.
Numbered technical notes, responses to the opposing party's submissions.
Preparation for, and technical attendance at, expert meetings.
Wind farm owner
Technical notes on cable joint failures and switching overvoltages, responses to the opposing party's submissions (dires).
Generating substation
Analysis of SCADA logs, identification of control hunting and projection of circuit-breaker wear.
No. We act as a party's technical adviser, as stated in the engagement letter.
Yes. A failure analysis carried out early often avoids proceedings or helps to prepare for them better.
For a project, give us the voltage, power, location and deadline in a few lines.