LDHT Engineering, power system engineering consultancy

Service

Owner's engineering

We represent the project owner on MV / HV electrical matters, from the definition of needs to energisation.

The project owner rarely has an HV specialist in house, while the contractor or integrator works within its own cost and schedule constraints. We review what is proposed, check compliance and technical correctness, and state what needs to be changed, as early as possible in the project.

Our comments are ranked blocking, major and minor, with a reference to the requirement (contract, standard, network operator) or the calculation that supports it. We do not issue a comment without a justification.

For the critical calculations (short-circuit, voltage plan, protection coordination, earthing), we carry out our own check calculations in addition to reviewing the contractor's notes.

01What we do

Before construction

  • Definition of needs and architecture
  • Drafting or review of the CCTP
  • Technical bid analysis

During construction

  • Design review (VISA) of execution studies
  • Review of substation drawings
  • FAT / SAT follow-up
  • Energisation and close-out of punch-list items

02Examples

Étapes d'un projet de poste HTA / HTB et interventions de LDHTNeeds1Upstream studies2Specification3Bids4Design review5Factory FAT6Construction7Site SAT8Energisation9LDHT involvementout of scope
Fig. 01MV / HV substation project and LDHT involvement as owner's engineer.
Schematic diagram of a 225 / 20 kV point-of-connection substation with two transformersRTE incomer 1Q1RTE incomer 2Q2225 kVQ11TR1225 / 20 kVQ21Q12TR2225 / 20 kVQ2220 kVbus couplerD1D2D3D4to IT halls / UPS87T50/51
Fig. 02Schematic diagram of a 225 / 20 kV point-of-connection substation with two transformers.
HV switchgear: instrument transformers and post insulators in a substation
Fig. 03HV switchgear, instrument transformers and post insulators.Photo

03Our offer

Usual content of an offer for this type of assignment. The exact scope, deliverables and price are set in the quotation.

  1. Package 1Needs and architecture

    Power, redundancy, phasing, interfaces.

  2. Package 2Tendering

    Technical specification (CCTP) or its review, technical bid analysis.

  3. Package 3Execution

    Design review (VISA) of studies and drawings, check calculations.

  4. Package 4Testing and energisation

    Attendance at FAT and SAT, follow-up of punch-list items.

04How we work

  1. 01Needs and architecture

    Power, redundancy, phasing, interfaces.

  2. 02Tendering

    Technical specification (CCTP), technical bid analysis.

  3. 03Execution

    Design review (VISA) of studies and drawings, check calculations.

  4. 04Testing and energisation

    FAT at the factory, SAT on site, punch-list items.

05References

Data centre operator

225 kV GIS substation

Design review and review of the studies (VISA). We found deviations on the voltage transformers and on trip circuit redundancy.

Data centre, Île-de-France

225 / 20 kV substation

Review of the drawings for the entire substation package against the client's requirements, with the list of major deviations.

39 MW storage plant

Audit of a 33 kV single-line diagram

Review of the integrator's diagram and list of corrections to request, for the project owner.

All references

06Frequently asked questions

Owner's engineering or design and supervision engineering?

As owner's engineer, we advise the project owner and carry out the checks. We do not take on full design and supervision engineering (maîtrise d'œuvre). We do, however, provide ad hoc support to the teams that do, on MV / HV aspects.

Full or targeted review?

Both are possible. A review can be limited to compliance with the client's requirements, with the major issues reported.

07See also

For a project, give us the voltage, power, location and deadline in a few lines.
Reply within 48 working hours.