Integrator, West Africa
9 MWp, 30 kV PV plant
LV, MV and DC arc flash: incident energies and PPE per work location.
Study
Incident energy at each work location, arc flash boundary and suitable personal protective equipment (PPE).
The incident energy of an arc is proportional to its duration. At equal current, an arc cleared in 70 ms releases five times less energy than an arc cleared in 350 ms. The protection settings therefore also determine the risk for the person carrying out the work.
The calculation follows IEEE 1584 up to 15 kV. Above that, we apply the Lee method, which is more conservative, and we state it in the note. PPE categories follow NFPA 70E, in addition to your site rules and NF C 18-510.
For direct current (PV plants, batteries), the calculation methods are specific and we treat them separately.
Usual content of an offer for this type of assignment. The exact scope, deliverables and price are set in the quotation.
Short-circuit currents, clearing times, switchboard geometry.
Incident energy and arc flash boundary per work location.
Proposed maintenance settings, logic discrimination, arc detection.
PPE table and labels in the chosen format.
Short-circuit currents and clearing times per switchboard.
Incident energy, arc flash boundary, per work location.
Maintenance settings, logic discrimination, arc detection.
Labels and PPE table.
Integrator, West Africa
LV, MV and DC arc flash: incident energies and PPE per work location.
Industrial site
MV protection coordination and on-site check of the settings.
IEEE 1584 for the calculation, NFPA 70E for PPE categories, in addition to your site rules.
Yes, by reducing clearing times through maintenance settings, logic discrimination, arc detection or differential protection.
For a project, give us the voltage, power, location and deadline in a few lines.