Data centre operator
225 kV GIS substation
Design review and review of the studies (VISA). We found deviations on the voltage transformers and on trip circuit redundancy.
References
Clients are anonymised. They are operators, general contractors, developers, integrators and manufacturers.
Data centre operator
Design review and review of the studies (VISA). We found deviations on the voltage transformers and on trip circuit redundancy.
General contractor
Selection of protection functions, current transformer sizing, settings, follow-up of testing through to commissioning.
Data centre, Île-de-France
Review of the drawings for the entire substation package against the client's requirements, with the list of major deviations.
Data centre, Île-de-France
Audit of the existing scenarios and sweep of upstream voltage × configurations. The on-load tap changer range of the 225 kV transformers proved insufficient.
Data centre campus
Earth grid, step and touch voltages, earth potential rise, compatibility with telecom networks.
Storage developer
Transformers, switchgear, cables, protection and earthing. Preparation of tender documents and follow-up through to construction.
39 MW storage plant
Review of the integrator's diagram and list of corrections to request, for the project owner.
Storage plant connected at 225 kV
Grid-following and grid-forming inverter models, study cases defined according to CIGRE publications.
Power producer, PV plant
Distortion levels across several scenarios, resonance risk and transformer derating.
Integrator, West Africa
Load flow, short-circuit, neutral earthing, earthing, stability and protection plan for each plant.
Integrator, West Africa
LV, MV and DC arc flash: incident energies and PPE per work location.
Heavy industry
Condition of substations and protection, identified risks and costed recommendations, ranked by priority.
Industrial site
MV protection coordination and on-site check of the settings.
63 and 225 kV substations
Differential protection and on-load tap changers. Testing carried out with Volt Expertise.
Wind farm owner
Technical notes on cable joint failures and switching overvoltages, responses to the opposing party's submissions (dires).
Generating substation
Analysis of SCADA logs, identification of control hunting and projection of circuit-breaker wear.