Studies

Studies

We carry out calculations in ETAP and PowerFactory, on our own licences. Scope and price are set at the outset, and every operating configuration is calculated.

In each study, we look for the worst-case configuration. We work in campaigns. The model is checked first, then in-house scripts run every relevant combination of upstream voltage, topology, load and tap position. Each result is checked before it is used.

The eight studies below are often combined. A protection plan relies on short-circuit and load flow, an arc flash study on the settings, a grid connection study on load flow, harmonics and dynamics. Each page describes the method, the data to provide and the typical offer.